Location : Riverside County, CA
Salka Cabazon Wind Farm
The Salka Cabazon wind farm is located in Palm Springs area, is an operating facility with a capacity of 37.4 MW and was built in the 1990s. It has been in operations since 1999.
Salka acquired Cabazon, a 37.4MW project in October 2023 in Riverside County. The farm consists of 50 turbines; 49 Zond Z48 and 1 RRB 47.
With a capacity of 37.4 MW, the wind farm is expected to power more than 11,000 homes and remove 48,749,400 tons of CO2.
Status
— Operational —
Facility Megawatt Capacity | 37.4 MW |
Site Control | 375 acres under contract |
PPA | City of Riverside |
Technology | Wind |
Commercial | Operating |
Utility | Southern California Edison |
Equipment | 49 Zond Z48 and 1 RRB 47 |